A year is fulfilled since the introduction of the first phase of the tram in Zaragoza.

At the end of the post you will find my personal opinion.

To explain to the citizenship the second phase of the tram, we were requested to product several urban renders to explain the visual impact.

In this occasion, in contrast to the infographics of the first phase, the tram did not play a leading role in the images. People had already been used to its presence in the city. Our urban render work consisted of transmitting changes in the urban layout of the city that this second phase was going to cause. Showing the tram as the focus of their wake was not interesting. The point was transmit the benefits of the solution in relation to roads, green areas, bike paths, etc.

Four locations were chosen: Paseo Independencia, Mercado Central, Actur and Parque Goya.

The information provided by the team of architects Alday Jover, consisted of:

Google Street view photographs to locate locations

  • Actur
  • Roman Walls
  • paseo independencia
  • Parque Goya
Plans of the routes and details of any kind regarding the catenary, street lamps, awnings, paving,…
Sketch of station on a photo reference
Before knowing this data, we conducted a “fieldwork” consisting of obtaining photographic details.
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
  • Tramway reference image
reference of material on the tramway area
We started with the advantage that the first phase of the tram was executed and running. We collected information on how are the catenary, awnings, road surfaces, vending machines…Once known the locations, and praying for the day come out sunny, we approached the four locations for several days to take photos. Later, in dialogue with our clients, we chose the photos, that for different reasons, would be the basis of the urban render.
Our intranet system for clients allowed an effective process of “feedback”. Pictures were uploaded and the various responsible for the final result made their comments. In projects of this nature where the customer is not unique, our system allows to create a record with all the appreciations and suggested changes. It is essential for not having contradictions.

Paseo Independencia urban render

It is one of the main boulevards of the city. It is very recognizable by citizens. Consequently, the margin for error is zero. Any details made bad could be detected immediately.A central point of view was chosen. The reference to current rails, was the key to the proper matching of 3d scene over the photography made (I must say with a plus of dangerousness).
  • Tramway on Paseo Independencia
  • Tramway on Paseo Independencia
  • Tramway on Paseo Independencia
  • Tramway on Paseo Independencia
  • Tramway on Paseo Independencia
  • Tramway on Paseo Independencia
  • Tramway on Paseo Independencia
  • Tramway on Paseo Independencia
  • Tramway on Paseo Independencia
Eliminating taxis of the photo caused the appearance of voids. We had to recreate the “hidden” sidewalks. People were incorporated, new trees, facades and arches were retouched. In short, everything you need to recreate as faithfully as possible the project and the environment.As I said, the tram should appear in the urban renders, but it should not play the leading role. Initially, I had more presence in the proposed photomontage.Finally, it became the background.This decision cost us a lot to digest because, as we did not know initially this decision, we modeled in great detail the tram in 3 dimensions.

FREE

EBOOK

50010

Insert your email to receive the guide as hundreds of real estate professionals have done

Hire

without failures

the renders you need

As the person responsible for this website, I, Juan Gayarre Calvo, ensure you that the personal details submitted in this form will be handled by me alone. The purpose of collecting this personal data is to manage the subscription service and send periodical newsletters with information of interest to you, as well as sales on related products or services. If you wish to exercise your rights of access, correction, limitation, suppression of your personal details, or submit a complaint to a supervisory authority, please email info@gayarre.eu

Tramway 3d model

Mercado Central urban render

Tramway on Roman Walls
Another site that resides in visual memory of citizens. The more elements must be removed from the base picture, the more complicated the photomontage.In this case, all existing vegetation in front of the walls had to be removed. To do this, we modeled and texturized the walls in three dimensions, we completed the parts of the building in cream placed back and “cleaned” the fence near the Mercado Central. The sidewalk on the right is extended. We modeled it and put some “invisible trees” that provided shadow. The other elements, platform, benches, rails, were easier to incorporate into the urban render.
  • Tramway on Roman Walls
  • Tramway on Roman Walls
  • Tramway on Roman Walls
  • Tramway on Roman Walls
  • Tramway on Roman Walls
  • Tramway on Roman Walls
  • Tramway on Roman Walls
  • Tramway on Roman Walls
The incorporation of people and a thorough study of photo lighting, made the final result consistent.Images with a more obvious presence of the tram were also discarded.

Actur – World Trade Center

Tramway on Actur
Unlike the above locations, we needed the presence of the World Trade Center to locate the viewer.The protagonists of this photomontage were the successive lines of urbanization: lanes for road-way traffic – tramlines – bike path – green parterre and sidewalk.
  • Tramway on Actur
  • Tramway on Actur
  • Tramway on Actur
  • Tramway on Actur
  • Tramway on Actur
  • Tramway on Actur
  • Tramway on Actur
  • Tramway on Actur
Recreating the shadows of the trees dropped on the bike path and routes and new trees placed on the left required special attention.

Parque Goya

Parque Goya
It was the least recognizable location. First, performing serial multiple photos was necessary.

FREE

EBOOK

50010

Insert your email to receive the guide as hundreds of real estate professionals have done

Hire

without failures

the renders you need

As the person responsible for this website, I, Juan Gayarre Calvo, ensure you that the personal details submitted in this form will be handled by me alone. The purpose of collecting this personal data is to manage the subscription service and send periodical newsletters with information of interest to you, as well as sales on related products or services. If you wish to exercise your rights of access, correction, limitation, suppression of your personal details, or submit a complaint to a supervisory authority, please email info@gayarre.eu

  • Parque Goya
  • Parque Goya
  • Parque Goya
  • Parque Goya
  • Parque Goya
  • Parque Goya
  • Parque Goya
From there, they were joined eliminating the existing tree at the roundabout. It was important to visualize the confluence of streets and the introduction and crossing of the rails in the neighborhood. When this is done, the realization of urban render is complicated. The vanishing points are confused and it is harder to fit it all.As it was expected, the news of the works of the second phase of the tram, grabbed some covers in the local press.
Main page of Heraldo de Aragón newspaper with the render of the tramway by GAYARRE infografia

My opinion on the tram

I already say it is contradictory. On one hand, I am against the operation.On the other hand, I enjoy the benefits today. It is fast and efficient.
However, I think it is a return to the past. These are my arguments:

  1. Urbanistically it generates a similar barrier (similar only) to the train. I do not understand that some arguments are used to bury the railway and others to implement the tram. It is a rigid infrastructure.
  2. The use of electricity is not an argument for environmental cleanup. The tram does not generate smoke, but power plants are not the paradigm of sustainability.
  3. I think with the budget used they could have made a long-term approach. Something that, no doubt, is not the main criteria of those who have to decide. Their “wants” have a maximum four-year horizon. For example, a fleet of hydrogen buses would have been a more flexible solution in time. Today may be the hydrogen and tomorrow solar power. Who knows? With the cost of the works they could make changes to the means of transport when it was requested. Without works and adaption to the technology in time.
  4. The works have caused some irreparable losses to traders. It cannot be an argument that they have now improved their situation. Rebuttable argument anyway because, with fewer stops there is less bart traffic.

We also developed another tram project. This time for Balear Govern.

Let’s enjoy the tram. The desire of a few has been achieved. In short, a streetcar named desire.